Building size

165,117 SF

Location

Prime Toronto location

Developer

Urbacon

Total Capacity

22 MW

Design Standards

Tier III Uptime Design Standards

Phased Development

Yes – turnkey alternatives and phased approach for critical infrastructure

Purpose

Highly secure data hosting for the colocation market

Management

Urbacon managed all engineering, design, and construction, accountable for full project delivery

Compliance

Full compliance with global specifications

Client Engagement

Regular roundtable discussions with clients and consultants

Design Approach

100% available, concurrently maintainable scheme for critical IT infrastructure

Design Deliverables

• Needs analysis
• Basis of Design reviews
• Schematic Design (Architectural, MEP, Security)
• Detailed Design (Architectural, MEP, Security)
• Construction Documents (Architectural, MEP, Security)
• Utility services design (27,600 volts electrical service)
• Access roads, landscaping, civil design
• Phased design for electrical/mechanical infrastructure

Unique Aspects

Underground network of MV and LV gear

Generator Capacity

Each 2.5MW to 3MW generator can support 48 hours of emergency power

Heat Rejection Efficiency

Minimum PUE of 1.1

Data Hall Capacity

Each hall: 1.5 to 2.5 MW

Modular Interior Planning

Data halls arranged along exterior walls near external cooling equipment