Toronto Data Centre 1

Technical Specifications

Category Specification
Location Heart of Canada’s digital corridor, Barker Business Park Digital Campus
Facility Size 118,135 SF
Total Capacity 8 to 16 MW as required
Phased Development Yes – turnkey alternatives and phased approach for critical infrastructure
Purpose Highly secure data hosting for the colocation market
Unique Aspects • Advanced chiller design with minimum PUE of 1.1 • Distributed and redundant KyotoCooling© systems per data hall • Each hall capacity: 1.5 MW (upgradable to 2.0 MW) • Modular “pods” along exterior walls near cooling equipment • KyotoCooling© used in data halls and electrical rooms • Underground network of MV and LV gear
Management Urbacon managed all engineering and design services for an aggressive delivery (8 months). Accountable for overall project delivery with full compliance to global specifications.
Client Engagement Regular roundtable discussions with client and consultants
Design Approach 100% available, concurrently maintainable scheme for critical IT infrastructure
Design Deliverables • Needs analysis • Basis of Design reviews • 100% Availability design • Schematic Design (Architectural, MEP, Security) • Detailed Design (Architectural, MEP, Security) • Construction Documents (Architectural, MEP, Security) • Utility services design (27,600 volts electrical service) • Access roads, landscaping, civil design • Phased design for electrical/mechanical infrastructure
Generator Capacity Every 3MW generator can support 48 hours of emergency power