
Successes
Bell Gatineau Data Centre
Overview
Green Energy Meets Tier III Uptime
This Tier III, LEED® Gold-certified facility reflects Urbacon’s commitment to sustainable, high-performance design. With a power usage effectiveness (PUE) of 1.26, the data centre reduces emissions by 12,000 tons annually and saves 17 million kWh—enough to power over 1,400 homes. Features include rainwater harvesting, passive free air cooling, and a transformer-free power system that reduces copper use by 26 tons.

Project Info
Location
- Gatineau, Quebec
Megawatts
- 5.4 MW Of Critical Power
Square feet
- 250,000 SF
Completion Date
- 2012