OVERVIEW       LOCATION       BENEFITS       DATA CENTRES       GALLERY       BROCHURE       CONTACT


DC2 UNDER CONSTRUCTION

Pre-leasing opportunities available now


Contact us

DC2 IN BARKER DIGITAL CAMPUS

DC2 is the second Next Generation data centre to be constructed in the five-building digital campus in Richmond Hill, Ontario.

Offering a highly-reliable 2N design – to ensure an uninterrupted power supply – and with a Power Usage Effectiveness (PUE) of 1.2 annualized or better, UDCS clients benefit from a significant power saving.

With white space available, DC2 will provide turnkey and colocation alternatives to clients looking to take advantage of one of the most robust fibre-optic networks in North America, highly reliable power and at-scale development with further room for expansion.


KEY FEATURES

  • Prime location

    140 million residents within a 500km radius

  • Connectivity

    One of the most robust fibre-optic networks in North America

  • Scalable solutions

    There is almost 500,000 SF of data centre space on campus


DC2 FEATURES


  • BUILDING DESCRIPTION
    Building size 94,691 SF
    Utility power PowerStream, 27,600 volts
    Parking 41 parking spaces
    Number of storeys 1 plus mezzanine
    Loading docks 2 indoor with dock levellers
    COMPUTER ROOM SPECIFICATIONS
    Available rooms Multiple
    Standard critical power 1.5 MW per data hall, upgradable to 2.0 MW
    High density ready Yes
    Approximate size 10,000 SF for IT equipment
    Maximum cabinet space Variable 550 standard 24’W x 48”D or 330 standard 32”W x 48”D
    COMPUTER ROOM DENSITY
    Standard density 150 watts per square foot
    Optional density 200 watts per square foot
    COMPUTER ROOM DESCRIPTION
    Computer rooms Dedicated
    Floor height Slab on grade, 18’ building height
    Floor to ceiling height Base design with drop ceiling 12’6” to 13’6”
    Floor loading 200 pounds per square foot
    SECURITY
    Building and perimeter Security check point for all access, ballistic glass and walls
    Security guards Yes, 7x24x365
    Access control Yes, electronic access with dual authentication, minimum 1 biometric reader
    Video surveillance Yes, 7x24x365 of all exterior and interior areas, minimum 30 days of archive
    CRITICAL POWER
    Total megawatts 8 or 16 MW as required
  • UPS SYSTEMS
    Description High efficiency static UPS
    Redundancy N+1 or 2N as required
    GENERATORS
    Description 2.5 MW diesel generator
    Redundancy N+1 or 2N as required
    ON SITE FUEL CAPACITY
    Storage tanks Sub-base tanks or underground as required
    Fuel runtime 24 hours minimum
    HEAT REJECTION SYSTEMS
    Description Distributed and Redundant KyotoCooling systems dedicated per data hall. Or Chilled Water solution to spec
    Redundancy N+1
    Efficiency Mechanical PUE of 1.2 Annualized or better
    Efficiency at utilization Unaffected by critical load utilization
    PDUs
    Description 250 amp overhead busway, optional multiple 400 KVA PDUs, 480V primary, 400/230V secondary available
    Redundancy 2N
    COMMUNICATIONS
    POE 2 separate network points of entry with diverse underground duct banks to metropolitan network
    Conduits Dedicated diverse conduits and risers to each data floor
    Multiple carriers Yes, data centre is carrier neutral
    FIRE PROTECTION
    Description Double interlocked pre-action dry type sprinkler system with VESDA throughout building



    *Some specifications listed are optional.